•  
  •  
  •  

SECI again extends bidding window in 3-GW solar tender with manufacturing

Welspung solar park in Madhya Pradesh. Source: Welspun Renewables.

April 9 (Renewables Now) - The Solar Energy Corporation of India (SECI) has once again extended the deadline in a 3-GW solar tender linked with 1.5 GW of annual manufacturing capacity.

The agency said last week that bidding will be open by April 22, granting developers additional time to submit proposals. This is the second deadline extension in the tender that was issued at the end of January. SECI initially sought proposals by March 18 but later extended the deadline for participation to April 4.

Developers taking part in the competition have to make offers for at least 1 GW of Interstate Transmission System (ISTS)-connected solar capacity associated with 500 MW of manufacturing capacity at a maximum tariff of INR 2.75 (USD 0.040/EUR 0.035) per kWh.

SECI intends to open the techno-commercial bids on April 23.

(INR 10 = USD 0.144/EUR 0.128)

More stories to explore
Share this story
Tags
 
About the author
Browse all articles from Veselina Petrova

Veselina Petrova is one of Renewables Now's most experienced green energy writers. For several years she has been keeping track of game-changing events both large and small projects and across the globe.

More articles by the author
5 / 5 free articles left this month
Get 5 more for free Sign up for Basic subscription
Get full access Sign up for Premium subscription