Neoenergia SA (BVMF:NEOE3) has received the first tranche of the BRL-1.3-billion (USD 247.3m/EUR 227.4m) loan they secured previously to fund the construction of a 370.8-MW portion of the 471.2-MW Chafariz wind complex.