(SeeNews) - Jul 23, 2012 - Brazilian power sector watchdog Aneel on Friday allowed the test start-up of the second and third generation units, with a capacity of 20 MW and 25 MW, respectively, at the Bioenergia Lagoa da Prata thermoelectric power plant (TPP).