(SeeNews) – Apr 5, 2012 – US Geothermal (TSE:GTH) said on Wednesday that the engineering, procurement and construction (EPC) contractor for its 8.6-MW San Emidio power plant has detected excessive vibration in a gearbox during turbine testing.