SecureEnergy, a 50/50 joint venture (JV) between Australian construction company Clough and Spanish power infrastructure builder Elecnor SA (BME:ENO), has signed the EPC contract to build the New South Wales section of the 900-km (559.2 miles) EnergyConnect high-voltage interconnector with South Australia, the joint venturers announced.