Design and consultancy firm Arcadis (AMS:ARCAD) and Pondera Consult will be in charge of the Environmental Impact Assessments (EIAs) and permit applications preparation for the links that will connect the 4-GW IJmuiden Ver offshore wind area to the Dutch grid.