US energy developer Ameresco Inc (NYSE:AMRC) has launched commercial operations at a 50-MW/200-MWh battery in Arizona, the state’s largest behind-the-meter (BTM) facility, for steel manufacturer Nucor Corp (NYSE:NUE).