•  
  •  
  •  

to-the-point: RES inaugurates 17.6-MW wind park in France

Image by: Renewable Energy Systems (www.res-group.com).

June 18 (Renewables Now) - Renewable Energy Systems Ltd (RES) on Saturday inaugurated a 17.6-MW wind park in Lorraine, Meuse department, northeastern France.

The so-called Rosieres wind farm comprises eight of Vestas’ V100 wind turbines, each with a generation capacity of 2.2 MW. Combined, they are able to produce enough power to meet the annual consumption of over 22,400 people.

RES began building the plant in March 2018 and achieved full commissioning in December 2018, it said.

Also in Lorraine, RES built the 36-MW Trois Sources wind farm, which has been operational since 2007.

More stories to explore
Share this story
Tags
 
About the author
Browse all articles from Ivan Shumkov

Ivan is the mergers and acquisitions expert in Renewables Now with a passion for big deals and ambitious capacity plans.

More articles by the author
5 / 5 free articles left this month
Get 5 more for free Sign up for Basic subscription
Get full access Sign up for Premium subscription