France's Voltalia developing new 1.5-GW solar cluster in Brazil

The Castellet solar park. Photo by: Voltalia (www.voltalia.com).

June 27 (Renewables Now) - French renewable power producer Voltalia SA (EPA:VLTSA) today announced it is developing a new solar photovoltaic (PV) cluster in the Brazilian state of Minas Gerais with a potential capacity exceeding 1.5 GW.

Voltalia said it is working on the new Arinos cluster both for its own account and for third parties, having already entered into a number of partnerships. This includes one with CTG Brasil, which intends to contract a portion of the capacity once the development phase of a project within the cluster is completed.

The French company pointed out that the development of large clusters enables the pooling of infrastructure, connection networks and maintenance. It has already originated two such clusters in Brazil – the 2.4-GW Serra Branca in Rio Grande do Norte and the 1-GW-plus Canudos in Bahia.

Voltalia already has 688 MW of wind and solar power plants in operation within Serra Branca and is currently building an additional 517 MW of solar there, while within Canudos it has a 99-MW wind farm under construction.

Join Renewables Now's free daily newsletter now!

More stories to explore
Share this story
Tags
 
About the author
Browse all articles from Ivan Shumkov

Ivan is the mergers and acquisitions expert in Renewables Now with a passion for big deals and ambitious capacity plans.

More articles by the author
5 / 5 free articles left this month
Get 5 more for free Sign up for Basic subscription
Get full access Sign up for Premium subscription
\