Brazil’s Claro inaugurates 4.65-MWa DG biogas plant

Landfill

June 21 (Renewables Now) - Brazilian telecom Claro SA announced last week it has connected to the grid the largest distributed generation (DG) biogas plant in the country, able to produce up to 4.65 average megawatts (MWa).

Built by the energy arm of local conglomerate Grupo Rezek, RZK Energia, the biogas plant spreads over 700 sq m (7,534.7 sq ft) in the municipality of Nova Iguacu, Rio de Janeiro state.

The facility consists of a set of four engines that are connected to the city's municipal landfill. Biogas will be generated from methane gas (CH4) and carbon dioxide (CO2) released by organic waste decomposing in the landfill.

The output will be used to meet the demand of the 2,991 consumer units that the telecommunications company has in the state, including telephone towers and data centres. By doing so, Claro will be able to offset 15,723 tonnes of carbon dioxide (CO2) emissions annually.

The plant is part of the telecom's clean energy programme, ‘A Energia da Claro’, which foresees the use of renewable power in all its Brazilian operations.

More stories to explore
Share this story
Newsletter
Tags
 
About the author
Browse all articles from Lucas Morais

Lucas is based in Brazil. He joined Renewables Now to expand coverage of the Ibero-American market, a highly attractive destination for green energy investment.

More articles by the author
5 / 5 free articles left this month
Get 5 more for free Sign up for Basic subscription
Get full access Sign up for Premium subscription
\